Electric Power Supply details –

S.N. Present Electric Load 3 Phase
50 K.W.
Link to Documents
1. Date of Connection 01 August 2004 Electricity Bill
2. Connection in the name of D N Bhushan Shiksha Evam Vikas Sansthan Electricity Bill
3. Meter No. T20580Z1 Electricity Bill
4. Seal No. M171146-47 Joint Inspection Report
5. Remarks if any